Connect with us

TOP STORIES

Peak power demand in J&K likely to surge by 6% | KNO

Published

on

kno news

Srinagar, Mar 18 (KNO): Jammu and Kashmir is likely to face a four percent Compound Annual Growth Rate (CAGR) increase in electricity requirement and six percent increase in peak electricity demand for the period of 2025-26 to 2035-36. The official documents available with the news agency—Kashmir News Observer (KNO) reveal that it has considered electrical energy requirement projections as per J&K State Load Despatch Center (SLDC). The documents reveal that the SLDC has projected that the annual electrical energy requirement of the UT is likely to grow at a CAGR of 4 percent while the peak electricity demand for the utility is likely to grow at a CAGR of 6 percent for the period of 2025-26 to 2035-36. About the day-wise surplus coal capacity, the documents said that the surplus capacity is available with the Union Territory due to RE availability, demand variation etcetera.. “The UT has likely surplus capacity of around 700-900 MW during May to June months and 500 MW from July to September in 2028-29 which can be shared with other states and Discoms,” it reads. It also said that this capacity can be shared with other states and Discoms and reduce the fixed cost burden on the utility resulting in reduction in the cost to consumer. Earlier in previous week KNO reported that Jammu and Kashmir and Ladakh are likely to depend on nearly 30 percent of coal based energy by the year 2030. The official documents available in this regard reveal that the likely total projected contracted capacity for the year 2035-36 is around 11,001 Megawatts (MW). “The projected contracted capacity consists of 3239 MW from coal, 129 MW from gas, 68 MW from nuclear, 3666 MW from hydro, 2040 MW from solar, 598 MW from Distributed Renewal Energy (DRE) and 1261 MW from MTOA or STOA,” it reads. The documents further reveal that the capacity shall be able to meet the projected demand with prescribed reliability criteria. It also said that any deviations in the commissioning schedule of the planned capacity could result in a situation where the UT is unable to meet the projected peak demand and energy requirements identified with the available resources—(KNO)

Trending

TOP STORIES1 hours ago

Build strong, lasting connection with timeless traditions: LG Sinha to youth | KNO

TOP STORIES2 hours ago

Snowfall disrupts road connectivity across J&K, key highways closed | KNO

TOP STORIES2 hours ago

Kashmir markets bustling with last-minute Eid rush despite rain | KNO

TOP STORIES2 hours ago

J&K Bank logs Rs 8,300 crore Eid transactions across UT | KNO

TOP STORIES2 hours ago

SKIMS to fill 1,100 vacancies through JKSSB, JKPSC | KNO

TOP STORIES2 hours ago

CIK busts international cyber fraud racket in Srinagar | KNO

TOP STORIES2 hours ago

Parents in J&K demand urgent govt action as students stranded at Iran borders | KNO

TOP STORIES2 hours ago

Authorities in Sopore divert traffic, mark no-parking zones ahead of Eid | KNO

TOP STORIES2 hours ago

Pulwama B.Sc Nursing students seek relocation of exam centre | KNO

TOP STORIES2 hours ago

Kashmir bakers association recalls of distributing over 560 Eid kits to underprivileged families across Valley | KNO

TOP STORIES3 hours ago

Crescent not sighted, Eid on Saturday: Grand Mufti Nasir | KNO

TOP STORIES1 days ago

J&K Police's proactive, innovative strategy paying dividends | KNO

TOP STORIES1 days ago

Tight security arrangements put in place for Navratri at Vaishno Devi Shrine | KNO

TOP STORIES1 days ago

Northern Army Commander visits Jhangar, lauds troops for foiling infiltration bid | KNO

TOP STORIES1 days ago

Evening Aarti discipline of soul, expression of gratefulness: LG Sinha | KNO

TOP STORIES1 days ago

GOC Sharawat reviews preparedness of troops in Kathua | KNO

TOP STORIES1 days ago

Director SKIMS commissions advanced diagnostic facilities to strengthen precision healthcare | KNO

Copyright © 2021